Diamond wire cutting machine
1 The equipment must be grounded, and inflammable and explosive goods are not allowed near the equipment;
2. When debugging the mould, make sure to transfer the ejection switch to the left [of the shooting material (close)] so as to avoid ejection (remember!). ;
3. Do not transfer the ejection switch to [open] position when you are not working for a while. (in case of a failure of the operation to spew zinc, remember!) ;
4. After melting of zinc alloy, non-professional personnel should not operate after melting;
5 Remove the zinc alloy from the crucible before leaving work to be below the plane position of piston cylinder (this can prolong the life of the crucible);
6. Do not stand in the gap plane of die casting mould, so as not to spew out the scald!
7. Note: the setting of the thermostat no higher than 435 ºC, so as to avoid heating when the piston cylinder sleeve death and damage (within one month after new crucible don't set the temperature over 420 ºC).
8. In normal work, please cover the protective cover on the mould to avoid ejection!
9. If the inside of the crucible is turned, or the material always spatters, adjust the pressure of the projective material first, the life of the crucible can not be proved. Please change the crucible in time!
10. Please make sure the grounding line is reliable when using this machine;
11. Please add 46 # anti-wear hydraulic oil! Change it every one year! The amount of fuel is 50KG